Furnace Sequencer Q106 — 4 Switches — TYPE: Strip Heat And/Or Blower Fan In Heat Pumps And Electric Furnaces — MAIN SWITCH ON TIME (SEC.): 1 to 110 — MAIN SWITCH OFF TIME (SEC.): 1 to 110 — NUMBER OF TIMINGS: 2 — 24V input control — Pilot duty: 125VA at 120/480V — Supco and White-Rodgers — Switches 1 and 2 are simultaneous; for 2E608, switches 3 and 4 are simultaneous. — Inductive load: 14/7A at 120/240V — Resistive load: 25A at 120/240V, except 2FBW3 not rated for 120V resistive — Locked rotor amps: 42